At the first indication of trouble the engineer on watch shall notify the...

0 голосов
158 просмотров

At the first indication of trouble the engineer on watch shall notify the chief engineer and take immediate steps to prevent damage machinery. He must report to the engineer any change of the main engine speed or other important orders from the bridge. In case of emergency or malfunction he shall speedily do corrective actions. Grounds in electrical circuits, steam, air, oil or water leaks must be repaired promptly. When any alarm or protective device is found defective, the engineer on watch shall call the electrical engineer to repair or renew the defective item immediately.


Английский язык (26 баллов) | 158 просмотров
0

что тут именно надо сделать?

0

Переведите на русский язык отрывок из текста “Engine room watchkeeping
procedures ”:

0

Щас

0

так?

Дан 1 ответ
0 голосов

Ответ:

При первом же признаке неисправности дежурный инженер должен известить об этом начальника

проектируйте и принимайте немедленные меры для предотвращения повреждения оборудования. Он должен отчитаться перед вами

инженер любое изменение частоты вращения главного двигателя или другие важные заказы от

мост. В случае аварийной ситуации или неисправности он должен быстро произвести корректировку

действия. Заземление в электрических цепях, утечка пара, воздуха, масла или воды должны быть

починили быстро. Если какая-либо сигнализация или защитное устройство обнаруживаются неисправными, то

дежурный инженер должен вызвать инженера-электрика для ремонта или обновления неисправного оборудования.

пункт немедленно.

Объяснение:

(134 баллов)